How to Prepare Your Site Before Delivery Day
The number one cause of installation delays is an unprepared site. Here is exactly what you need to do before the crew shows up to install your metal building.
Your building is ordered, your delivery date is set, and you are excited. The last thing you want is to have the installation crew show up and have to turn around because the site is not ready. It happens more often than you would think — and it always costs time and money.
Here is exactly what you need to do before delivery day.
Step 1: Clear the Area
The installation footprint needs to be completely clear of trees, stumps, brush, debris, and any existing structures. Add at least 10 feet on all sides beyond the building dimensions for the crew to work safely.
If you have trees close to the site, make sure they are trimmed back so branches will not interfere with the roof panels or the installation process.
Step 2: Level the Ground
This is the most critical step. Your building needs a level surface to install correctly. The crew will check for level before they start, and if the ground is significantly off, they may not be able to proceed.
You do not need a perfect concrete slab (though that is ideal). A well-compacted, level gravel pad works great. Aim for no more than 1–2 inches of variation across the entire footprint.
Step 3: Establish Access
The delivery truck and installation crew need to be able to reach your site. Make sure:
- The driveway or access road can handle a heavy truck
- There are no low-hanging branches or power lines along the route
- The turning radius is adequate for a long flatbed
If access is tight, let your dealer know in advance so they can plan accordingly.
Step 4: Mark Your Corners
Before the crew arrives, mark the four corners of your building footprint with stakes or spray paint. This helps the installation go faster and ensures the building ends up exactly where you want it.
Step 5: Handle Utilities
If your building will have electricity, plan the conduit routing before installation. It is much easier to run conduit before the building goes up than after. Talk to your electrician about what needs to be in place on delivery day.
Step 6: Confirm Your Anchoring Plan
Know in advance whether you are anchoring into concrete, gravel, or dirt. Each requires different hardware. Your dealer should have confirmed this when you placed your order, but double-check before delivery day.
The Payoff
A well-prepared site means a smooth, fast installation. Most metal buildings go up in a single day when the site is ready. Do the prep work right and you will be enjoying your new building by sundown.
Questions about site prep? Call Sean at Rescue Metal Designs — he has seen every site situation imaginable and can help you get ready.